Water Treatment Plant
Project Description
This project involved the supply, installation, and commissioning of structural, mechanical, electrical, and finishing components for a water treatment plant at SaskPower’s Aspen site. The work was executed by a diverse team of skilled trades and supported by specialized sub-trades.
Scope of Work Included:
– Structural: Supply, furnish, and install structural components
– Mechanical: Furnish and install equipment and piping systems
– Electrical: Install electrical systems and instrumentation
– Finishing: Paint application for equipment and structural elements
Material Supply and Installation:
– Materials supplied: Pipe supports, process tubing and supports, equipment shims, Hilti anchors, chemical spray curtains
– Equipment installed: Equipment skids, dosing skids, tanks, totes, sumps, air receiver, tank heater, PLC panels, HMI
– Piping and supports: Hydrotesting, insulation, labeling
– Instrumentation: Transmitters, flow, level, pressure, and analyzer instruments; instrument racks and tubing
Trades and Sub-Trades Involved:
– Trades/techs: Iron workers, boilermakers, millwrights, pipefitters, electricians, instrumentation technicians
– Sub-trades: Grouting, scaffolding, painting, insulation, NDE (non-destructive examination), crane services
Market Scope
This project served the water supply market, supporting SaskPower’s infrastructure for clean and efficient water treatment. The installation of advanced mechanical and instrumentation systems ensures reliable operation and compliance with environmental standards, contributing to sustainable utility operations.
Date of Completion
October 2, 2026
Client
SaskPower, EPC contractor Burns & McDonnell
Location
Wolverine, SK
Facility Classification
Water treatment plant
Markets Served
Water supply